Thursday we were counterfitted!

Step 2 of getting new counters is getting templated. The whole process took perhaps 20 minutes but then we started looking at my audio system and since the guy was a former bass player for Johnny Law and me being an old metal head myself we talked about LFS (Low Frequency Stimulation).
I'm suppose to mention that he is single - not that I know his name.
ANYWAY - the guy comes in and lays his things on the counter and sticks stuff to the wall and takes photos.

He explained that in the old days they used cardboard and cut out templates, now they take snap shots and draw lines in the digital photos from dot to dot with their software.
Simple.
Now we wait for 2 to 3 weeks and when we get the call we will set a date for installation.

BUT FIRST. We have to take the old counters off, and uninstall the plumbing. This is making me a LITTLE nervous as the last time I was a plumber I had some problem with that faucet shutting off completely.
I'm also thinking of having an actual plumber do the install as what we have now is not that plastic pipe but metal and MIGHT be a fit problem with a new size sink.
Speaking of floors - take a look at this.
Puzzel Floors!!! What if you lose that last piece!!
Until next time!